This website use cookies and similar technologies to improve the site and to provide customised content and advertising. By using this site, you agree to this use. To learn more, including how to change your cookie settings, please view our Cookie Policy
Xmas Legs Small Present Present
Pocketmags Digital Magazines
CA
Pocketmags Digital Magazines
   You are currently viewing the Canada version of the site.
Would you like to switch to your local site?
Digital Subscriptions > Argyllshire Advertiser > 20th January 2017 > Work needed to halt A83 flooding

Work needed to halt A83 flooding

Sir,

I contacted BEAR Scotland last summer, and again recently, to support the letter in the Advertiser two weeks ago, which called for urgent action to improve the A83 at Erines.

This part of the A83 was difficult enough to drive on before the flooding, due to the width of the road. Two large vehicles passing side by side require good skill from the drivers to avoid a collision.

READ MORE
Purchase options below
Find the complete article and many more in this issue of Argyllshire Advertiser - 20th January 2017
If you own the issue, Login to read the full article now.
Single Issue - 20th January 2017
$1.39
Or 139 points
Annual Digital Subscription
Only $ 0.90 per issue
SAVE
35%
$46.99
Or 4699 points
6 Month Digital Subscription
Only $ 0.96 per issue
SAVE
31%
$24.99
Or 2499 points

View Issues

About Argyllshire Advertiser

Local news, sport and leisure includes FAB guide - for families in Argyll and beyond

Other Articles in this Issue