Hugh Boag
editor@arranbanner.co.uk
The new ferry which will serve Arran slides slowly into the water as the MV Glen Sannox is launched in a fanfare on the Clyde this week.
But it won’t be in the water long. The £48.5 million ship faces months in dry dock as the bulbous bow will have to be refabricated following a design flaw and challenges over the innovative dual fuel systems are overcome.