The upturned frames of No. 72010 Hengist are moved into the machine shop at CTL Seal Ltd, near Sheffield, on September 11.
PAUL DAVIDSON/CTL SEAL
THE frames of new-build BR'Clan'Pacific No. 72010 Hengistwere moved from the assembly shop to the machine shop at CTL Seal's factory in Sheffield on September 11 in readiness for the hornguides to be machined.
Milling was underway five days later after the frames had been set up on CTl:s large machining station.