£4m renewalfor Marlowbranch
TRACKonthe two-mile branchbetween Bourne End and Marlow in Berkshirewas renewed during a16-day closure in November. The multi-million-pound sawthe trackand sleepers renewed along the entirelength of the GWR-operatedbranch and eight levelcrossing surfaces replaced.