‘PANNIER’ PROGRESS: The overhaul of the Llangollen Railway Trust’s GWR 0-6-0PT No. 7754 reached a milestone over the weekend of November 12/13 when the boiler was returned to the rolling chassis. The boiler passed its steam test on the afternoon of November 10.
ANDY MAXWELL/LR
BACHMANN Europe has donated £1000 to the North Norfolk Railway. It follows the release of the manufacturer’s OO scale Scenecraft models depicting Weybourne Road Bridge (item No. 44-0072) and the Weybourne Water Crane & Tank (44-0073).
Both Bachmann Scenecraft models were released in recent years and follow similar successful models based on buildings and structures found at other heritage railways.
While the water crane and tank remains part of the current Scenecraft range, the road bridge has now been discontinued, although examples may still be found in stock with Bachmann retailers.