VOESTALPINE Turnout Technology UK has been awarded a contract to deliver track switches (points) and crossings for Phases 1 and 2a of HS2.
The deal includes the design, manufacture and delivery of around 180 switches and crossings, configured for traffic travelling over them at up to 360 kph (225mph) and diverging at up to 230kph (143mph), which will be installed between London and the connection with the West Coast Main Line at Crewe.