S F Belge 0-8-0T (ex-No. 699.01) No. 10 Sir Drefaldwyn pictured at Heniath on June 13, hauling the special donors’ train. The flowers on the smokebox handrails reflect an Austrian tradition during a celebratory event.
STEVE SEDGWICK
WELSHPOOL & Llanfair Light Railway’s (W&LLR) S FBelge 0-8-0T (ex-No. 699.01) No. 10 Sir Drefaldwyn hauled its first passenger train since early 2000 on June 13, following completion of what became a very protracted overhaul. The train of appropriate Austrian four-wheel carriages was a special operation from Llanfair Caereinion to Welshpool for people who had donated towards the restoration.