PREPARATIONS for the installation of two new 160-tonne viaduct spans for the iconic Barmouth viaduct have been taking place on the south shore of the Afon Mawddach.
The existing bridge spans are 154 years old and life-expired, and replacing them over a flowing river is a complex engineering task.