TRACK, points and signalling has been installed to connect the Strategic Rail Freight Interchange at SEGRO’s Northampton Logistics Park to theWest Coast Main Line.
TheWCML between Milton Keynes and Northampton was closed from September 2-10 to allow the work to take place. Due to open next year beside junction 15 of the M1, the site has five million square feet of warehouse space.The interchange will be used by logistics operator Maritime to transfer goods between rail and road.