Passengers load their bikes onto No. 153370 at Glasgow Queen Street on April 27, which with No. 156500 forms the 16.34 to Oban. Scotrail has a fleet of five Class 153s to help boost leisure traffic on theWest Highland Line.
PHIL WALLIS
THE measures being taken following the Carmont crash (see separate story) are reflected in NR’s £4.2 billion Strategic Business Plan for Scotland for Control Period 7 (covering April 2024 to March 2029), where 19% of planned renewals will cover earthworks, drainage and lineside management, and 22% is allocated to replacing structures.