SOLAR panels at Bedford, Three Bridges and Selhurst depots are expected to generate 3.7 gigawatt hours of electricity between them each year.
The panels will be installed following a successful trial scheme at Streatham Hill depot in south London, where over 500 solar panels were placed on the roof in 2021.