Vale of Aylesbury viaduct unveiled
HS2 contractor EKFB has been busy on the northern outskirts of Aylesbury preparing the groundworks for the Thame Valley viaduct, which will carry the high-speed line at low level across the river’s floodplain.
By Phil Marsh
Two of the 72 beams in position, showing the height of the Thame Valley viaduct over the river’s floodplain.
ALL PHOTOS TAKEN ON OCTOBER 30 BY PHIL MARSH
MAIN construction has begun on the 880 metre-long Thame Valley Viaduct to the north of Aylesbury.