Sir,
When superfast broadband was proposed for Morar, the original plan was to have it installed by the end of 2016. Mallaig and Arisaig are further than Morar from the exchange but they had it installed by the end of 2016.
It is now the end of 2017 and we have one cabinet in Morar, opposite the primary school.