Sir,
I’m sure it will be disappointing to everyone in the town that due to the knockon effects of a repair overrun, we have had to postpone the start of the summer service from Ardrossan to Campbeltown.
The MV Clansman’s propulsion system has had to be sent to Denmark for repair resulting in the fleet being one major vessel down.