No. 6 Blickling Hall emerges from North Bay Railway Engineering Services on March 30 to return to the Bure Valley Railway following fitting of a new boiler.The loco is being loaded onto the novel transporter developed by NBRES last year (RM, November 2020). The vehicle is available for hire to heritage lines for movement of comparatively small locomotives.
NORTH BAY RAILWAY ENGINEERING SERVICES
AN order last year for North Bay Railway Engineering Services (NBRES) to construct a new‘spare’boiler for the Bure Valley Railway’s (BVR)‘ZB’type locomotives has become an order for three new boilers to keep BVR’s Winson-built‘ZB’ 2-6-2s No. 6 Blickling Hall, No. 7 Spitfire and Winson/Keef 2-6-4T No. 10 Mark Timothy (which has the same type of boiler as the‘ZB’ pair) operational.
Lisez l'article complet et bien d'autres dans ce numéro de
Railway Magazine
Options d'achat ci-dessous
Si le problème vous appartient,
Connexion pour lire l'article complet maintenant.
Numéro unique numérique
1442 - May 2021
 
Ce numéro et d'autres anciens numéros ne sont pas inclus dans une nouvelle version de l'article
abonnement. Les abonnements comprennent le dernier numéro régulier et les nouveaux numéros publiés pendant votre abonnement. Railway Magazine
Abonnement numérique annuel
€40,99
facturé annuellement
Abonnement numérique de 6 mois
€21,99
facturé deux fois par an
Abonnement numérique mensuel
€4,99
facturé mensuellement