SCOTRAIL engineers supervised the removal of the train derailed by the recent mudslide at Loch Eilt last week and on Sunday it was transported by lorry through Spean Bridge to Brodie Engineering in Kilmarnock for assessment.
The West Highland Line was closed for a week after tonnes of mud and stone covered the track in the landslip between Arisaig and Glenfinnan.
None of the five passengers on board were injured and all the carriages stayed upright but services were disrupted between Fort William and Mallaig.