Está viendo la página Spain versión del sitio.
Le gustaría cambiar a su sitio local?
Última edición

Railnews Magazine Sept 2020 Edición anterior

English
10 Reseñas   •  English   •   Aviation & Transport (Rail)
Only €3,49
THE tragic derailment near Stonehaven on 12 August leads Railnews for September, which includes a special news feature with map, timeline of events and a message to everyone in the railway industry from Network Rail chief executive Andrew Haines.

In other news, the Retail Prices Index rose by 1.6 per cent in July. Criticism was fuelled by unconfirmed reports claiming that regulated rail fares would rise by the same amount. Train services are being increased ‘close to pre-pandemic levels’ from 7 September, although one victim of the pandemic has been the last of what was once a group of Railway Convalescent Homes. Bridge House at Dawlish had closed its doors in the spring and will not be reopening.

An £81 million project to replace out of date signalling at Hither Green in south east London was completed at the start of August, but heavy rain in mid-August left the Heart of Wales line blocked and damaged near Knighton, with buses replacing trains between Shrewsbury and Llandrindod Wells.

A business case for improving train services between Cambridge, Ipswich and Norwich is to be developed by consultants on behalf of the East West Rail Consortium, new Bombardier-built Class 701s for South Western Railway are to be branded ‘Arterio’, while the first tri-mode trains in Britain are set to enter service with GWR early in the New Year. Converted from former Thameslink Class 319 units, they will be able to use OHLE, the third rail or their own diesel power.

Timber traffic returned to Scottish railways in early August, after a gap of more than a decade during which all timber was carried by road.

Finally, two veteran railway staff are celebrating the completion of a century of service between them. You can read about them and much more in Railnews for September.
read more read less
Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages

Railnews

Sept 2020 THE tragic derailment near Stonehaven on 12 August leads Railnews for September, which includes a special news feature with map, timeline of events and a message to everyone in the railway industry from Network Rail chief executive Andrew Haines. In other news, the Retail Prices Index rose by 1.6 per cent in July. Criticism was fuelled by unconfirmed reports claiming that regulated rail fares would rise by the same amount. Train services are being increased ‘close to pre-pandemic levels’ from 7 September, although one victim of the pandemic has been the last of what was once a group of Railway Convalescent Homes. Bridge House at Dawlish had closed its doors in the spring and will not be reopening. An £81 million project to replace out of date signalling at Hither Green in south east London was completed at the start of August, but heavy rain in mid-August left the Heart of Wales line blocked and damaged near Knighton, with buses replacing trains between Shrewsbury and Llandrindod Wells. A business case for improving train services between Cambridge, Ipswich and Norwich is to be developed by consultants on behalf of the East West Rail Consortium, new Bombardier-built Class 701s for South Western Railway are to be branded ‘Arterio’, while the first tri-mode trains in Britain are set to enter service with GWR early in the New Year. Converted from former Thameslink Class 319 units, they will be able to use OHLE, the third rail or their own diesel power. Timber traffic returned to Scottish railways in early August, after a gap of more than a decade during which all timber was carried by road. Finally, two veteran railway staff are celebrating the completion of a century of service between them. You can read about them and much more in Railnews for September.


SELECCIONAR FORMATO:
Acceso instantáneo

Ofertas digitales disponibles:

Ejemplar digital único Sept 2020
 
3,49 / issue
Este número y otros números atrasados no se incluyen en un Railnews suscripción. Las suscripciones incluyen el último número de la revista y los nuevos números publicados durante el periodo de suscripción. €2,00 por número . Si desea suscribirse, consulte nuestro Opciones de suscripción
Los ahorros se calculan sobre la compra comparable de números sueltos durante un periodo de suscripción anualizado y pueden variar respecto a los importes anunciados. Los cálculos son meramente ilustrativos. Las suscripciones digitales incluyen el último número y todos los números regulares publicados durante su suscripción, a menos que se indique lo contrario. El periodo elegido se renovará automáticamente a menos que se cancele en el área Mi cuenta hasta 24 horas antes del final de la suscripción actual.

Issue Cover

Railnews  |  Sept 2020  


THE tragic derailment near Stonehaven on 12 August leads Railnews for September, which includes a special news feature with map, timeline of events and a message to everyone in the railway industry from Network Rail chief executive Andrew Haines.

In other news, the Retail Prices Index rose by 1.6 per cent in July. Criticism was fuelled by unconfirmed reports claiming that regulated rail fares would rise by the same amount. Train services are being increased ‘close to pre-pandemic levels’ from 7 September, although one victim of the pandemic has been the last of what was once a group of Railway Convalescent Homes. Bridge House at Dawlish had closed its doors in the spring and will not be reopening.

An £81 million project to replace out of date signalling at Hither Green in south east London was completed at the start of August, but heavy rain in mid-August left the Heart of Wales line blocked and damaged near Knighton, with buses replacing trains between Shrewsbury and Llandrindod Wells.

A business case for improving train services between Cambridge, Ipswich and Norwich is to be developed by consultants on behalf of the East West Rail Consortium, new Bombardier-built Class 701s for South Western Railway are to be branded ‘Arterio’, while the first tri-mode trains in Britain are set to enter service with GWR early in the New Year. Converted from former Thameslink Class 319 units, they will be able to use OHLE, the third rail or their own diesel power.

Timber traffic returned to Scottish railways in early August, after a gap of more than a decade during which all timber was carried by road.

Finally, two veteran railway staff are celebrating the completion of a century of service between them. You can read about them and much more in Railnews for September.
Seguir leyendo leer menos
Railnews is the number one publication for the rail industry, focusing on the people and business that keep today’s railway running. Originally produced in 1963 as the house newspaper for British Rail, Railnews continues to inform and impress in the modern industry. As well as in-depth editorial, the newspaper features views and opinions from readers and industry insiders alike.

omo abonado recibirá las siguientes ventajas:


•  Un descuento sobre el PVP de su revista
•  Su revista en su dispositivo cada mes
•  Nunca te perderás un número
•  Estás protegido de las subidas de precios que puedan producirse más adelante en el año

Recibirás 12 problemas durante un año Railnews suscripción a la revista.

Nota: Las ediciones digitales no incluyen los artículos de portada ni los suplementos que encontraría en los ejemplares impresos.

Su compra aquí en Pocketmags.com puede leerse en cualquiera de las siguientes plataformas.


Puedes leer aquí en el sitio web o descargar la aplicación para tu plataforma, sólo recuerda iniciar sesión con tu nombre de usuario y contraseña de Pocketmags.

Apple Pocketmags Online Pocketmags Google Pocketmags
La aplicación Pocketmags funciona en todos los dispositivos iPad y iPhone con iOS 13.0 o superior, Android 8.0 o superior y Fire Tablet (Gen 3) o superior. Nuestro lector web funciona con cualquier navegador compatible con HTML5, para PC y Mac recomendamos Chrome o Firefox.

Para iOS recomendamos cualquier dispositivo que pueda ejecutar el último iOS para un mejor rendimiento y estabilidad. Los modelos anteriores con especificaciones de procesador y RAM inferiores pueden experimentar una renderización de páginas más lenta y fallos ocasionales de la aplicación que están fuera de nuestro control.
4,5
/5
Basado en 10 Opiniones de los clientes
5
7
4
2
3
0
2
1
1
0
Ver comentarios

Really interesting

Great for all those trainspotters out there Revisado 25 abril 2022

Always contemporary

The most up-to-date information on all with regard to the railway network Revisado 09 abril 2022

Railnews

I had a lot of trouble getting Railnews online so I've had to go back to getting it delivered. now we're in this pandemic, I'm having to go back to reading it online again. Revisado 08 mayo 2020

Artículos de este número


A continuación encontrará una selección de artículos en Railnews Sept 2020.