FINISHING touches are being made to the £207 million Newhaven extension of the Edinburgh Trams system, after the final piece of track, connecting it to the existing network at Picardy Place, was laid in December.
The removal of fencing and infilling of excavations around lampposts was due to be the next phase of completion work on Leith Walk, with two-way road traffic expected to resume along its entire length during January.