Railway Digest  |  January 2026
Melbourne Metro Tunnel opens! RD brings you a spread from the big day.
Inside South Dynon Maintenance Facility: RD gets invited inside the V/Line Train Maintenance Facility in South Dynon, Melbourne. Martin Bennet reports from the floor.
Checking in with the Suburban Rail Loop: Work continues on the Suburban Rail Loop, a 90-kilometre orbital line connecting ten existing rail lines as well as five non-rail served activity centres in the middle and outer suburbs at an estimated cost of $50 billion.
AusRAIL 2025: High Speed Rail Authority CEO Tim Parker The man running point on the implementation of high speed rail in Australia made the keynote address at AusRAIL PLUS in November 2025, outlining his vision for the future. RD reports from Melbourne.
In conversation with Monash IRT's Ravi Ravitharan. Is high speed rail really going to happen this time? RD speaks to rail industry veteran Ravi Ravitharan, Director of the Monash Institute of Railway Technology, about his HSR hopes and the big challenges ahead.
Conference round-up. Philip Laird reports from the International High Speed Rail Association (IHRA) forum in Tokyo and the AFR Infrastructure Summit in Sydney.
en savoir plus
lire moins
En tant qu'abonné, vous bénéficierez des avantages suivants :
• Une réduction sur le prix de vente conseillé de votre magazine
• Les nouvelles éditions sont livrées sur votre appareil le jour même de leur sortie
• Vous ne manquerez jamais un numéro
• Vous êtes protégé contre les hausses de prix qui pourraient survenir plus tard dans l'année.
Vous recevrez 12 pendant une période de 1 an Railway Digest abonnement au magazine.
Remarque : les éditions numériques ne comprennent pas les éléments de couverture ou les suppléments que vous trouveriez avec les copies imprimées.
Articles dans ce numéro
Vous trouverez ci-dessous une sélection d'articles dans Railway Digest January 2026.