‘B12’ overhaul moves forward
THE Midland & Great Northern Joint Railway Society has confirmed that Riley & Son (E) Ltd is to be contracted for the mechanical overhaul of the engine chassis and tender of its LNER ‘B12/3’4-6-0 No. 8572. The engine chassis and tender are expected to move to Heywood, Lancashire by early March once space becomes available in the contractor’s workshop. The boiler overhaul will be undertaken by the North Norfolk Railway Engineering Team in the Weybourne boiler shop and is being prepared for a non-destructive examination by a specialist contractor, from which a detailed scope of the work required to overhaul the boiler can be produced. Visit www.mandgn.org if you would like to donate towards the appeal.
Lisez l'article complet et bien d'autres dans ce numéro de
Railway Magazine
Options d'achat ci-dessous
Si le problème vous appartient,
Connexion pour lire l'article complet maintenant.
Numéro unique numérique
March 2023
 
Ce numéro et d'autres anciens numéros ne sont pas inclus dans une nouvelle version de l'article
abonnement. Les abonnements comprennent le dernier numéro régulier et les nouveaux numéros publiés pendant votre abonnement. Railway Magazine
Abonnement numérique annuel
€40,99
facturé annuellement
Abonnement numérique de 6 mois
€21,99
facturé deux fois par an
Abonnement numérique mensuel
€4,99
facturé mensuellement