RESTORATION of the Ffestiniog & Welsh Highland Railway’s ex- South African Railways Société Anglo-Franco-Belge (works No. 2684) NG15 ‘Kalahari’ 2-8-2 No. 134 advanced significantly in January. The boiler, which has been undergoing overhaul at Locomotive Maintenance Services in Loughborough, was delivered to Dinas on January 13. No. 134’s rolling chassis was hauled out of the shed and the boiler transferred from the delivery lorry to the loco’s frames, with a pause while the ashpan was bolted into position under the foundation ring.
As darkness fell, No. 134, now with a boiler and looking much more like a steam locomotive, was moved into the goods shed. A week later, it was transferred to the loco shed for completion of the restoration, which is being led by Cymdeithas Rheilffordd Eryri/Welsh Highland Railway Society.
Lisez l'article complet et bien d'autres dans ce numéro de
Railway Magazine
Options d'achat ci-dessous
Si le problème vous appartient,
Connexion pour lire l'article complet maintenant.
Numéro unique numérique
March 2023
 
Ce numéro et d'autres anciens numéros ne sont pas inclus dans une nouvelle version de l'article
abonnement. Les abonnements comprennent le dernier numéro régulier et les nouveaux numéros publiés pendant votre abonnement. Railway Magazine
Abonnement numérique annuel
€40,99
facturé annuellement
Abonnement numérique de 6 mois
€21,99
facturé deux fois par an
Abonnement numérique mensuel
€4,99
facturé mensuellement