Construction Europe  |  November 2017
TUNNELLING
Major tunnel projects are getting in to their stride across Europe this year,
including high-speed rail projects, as Adrian Greeman discovered.
FALSEWORK & FORMWORK
Careful planning is the key to unlocking the full potential of falsework and
formwork. Thomas Allen investigates how increasingly demanding designs
are being realised.
UTILITIES
Whether it is laying pipes or fibre optic cables, the right machine for the job is a priority. Sandy Guthrie takes a look at what is new for contractors working on utilities projects.
INTERVIEW: INTERMAT
The next Intermat is in April 2018. Speaking to Isabelle Alfano, the new
director of Intermat, Thomas Allen finds out how the 2018 exhibition will be
different from previous editions.
Seguir leyendo
leer menos
omo abonado recibirá las siguientes ventajas:
• Un descuento sobre el PVP de su revista
• Su revista en su dispositivo cada mes
• Nunca te perderás un número
• Estás protegido de las subidas de precios que puedan producirse más adelante en el año
Recibirás 12 problemas durante un año Construction Europe suscripción a la revista.
Nota: Las ediciones digitales no incluyen los artículos de portada ni los suplementos que encontraría en los ejemplares impresos.
Artículos de este número
A continuación encontrará una selección de artículos en Construction Europe November 2017.