Construction Europe  |  November 2017
TUNNELLING
Major tunnel projects are getting in to their stride across Europe this year,
including high-speed rail projects, as Adrian Greeman discovered.
FALSEWORK & FORMWORK
Careful planning is the key to unlocking the full potential of falsework and
formwork. Thomas Allen investigates how increasingly demanding designs
are being realised.
UTILITIES
Whether it is laying pipes or fibre optic cables, the right machine for the job is a priority. Sandy Guthrie takes a look at what is new for contractors working on utilities projects.
INTERVIEW: INTERMAT
The next Intermat is in April 2018. Speaking to Isabelle Alfano, the new
director of Intermat, Thomas Allen finds out how the 2018 exhibition will be
different from previous editions.
ler mais
ler menos
Como subscritor, receberá as seguintes vantagens
• Um desconto no PVP da sua revista
• A sua revista entregue no seu dispositivo todos os meses
• Nunca perderá uma edição
• Está protegido contra aumentos de preços que possam ocorrer no final do ano
Receberá 12 edições durante um ano Construction Europe assinatura da revista.
Nota: As edições digitais não incluem os artigos de capa ou os suplementos que se encontram nos exemplares impressos.
Artigos desta edição
Segue-se uma seleção de artigos em Construction Europe November 2017.