A NUMBER of infrastructure projects have made progress or been completed at the Mid-Norfolk Railway. The former Spooner Row signalbox has now been completely refurbished with the roof and walls all receiving attention and the windows replaced. It has become the Wymondham Church Lane signal box, ready to begin a new phase of its working life.
The railway’s in-house S&T Department has now begun the resignalling of this part of the line, having installed the original lever frame and the first planned signal to be planted being a former LNER concrete post signal that was recovered from Somerleyton Swing Bridge.