The A82 Partnership says it is trying to ensure traffic lights used during planned bridge replacement work near Glencoe Village starting in the spring will be manually operated.
The A82 Partnership’s Stewart MacLean said the move will help reduce long tail backs of traffic during the seven months’ construction process throughout the busy main summer tourism season.
BEAR Scotland has been commissioned by Transport Scotland to replace the existing Allt Fhiodhan Bridge which carries the A82 trunk road over the Allt Fhiodhan watercourse. The bridge is located approximately one mile south of Glencoe Village, is around 89 years old and does not meet the requirements of current design and assessment standards.
Lisez l'article complet et bien d'autres dans ce numéro de
The Oban Times & Lochaber Times
Options d'achat ci-dessous
Si le problème vous appartient,
Connexion pour lire l'article complet maintenant.
Numéro unique numérique
06 December 2018
 
Ce numéro et d'autres anciens numéros ne sont pas inclus dans une nouvelle version de l'article
abonnement. Les abonnements comprennent le dernier numéro régulier et les nouveaux numéros publiés pendant votre abonnement. The Oban Times & Lochaber Times
Abonnement numérique de 6 mois
€28,99
facturé deux fois par an
Abonnement numérique annuel
€51,99
facturé annuellement