This home was built by Glosford SIPs (
www.glosfordsips.co.uk), who get the house to weathertight stage, leaving you to coordinate the internal fit out.
Understanding what needs to happen and the order of it all varies from project to project. There may be some flexibility at later stages of the build, but until it is wind and watertight, the order of work is fairly obvious. This month, I’m looking at how to draw up a simple schedule that can be used as a high-level plan for your scheme. I’m assuming that you have already acquired a plot and that there is an architect or designer on board with drawings at an advanced stage.
Statutory requirements