Sie sehen gerade die Germany Version der Website.
Möchten Sie zu Ihrer lokalen Seite wechseln?
Neueste Ausgabe

Railnews Magazine Aug-18 Zurück Ausgabe

English
10 Bewertungen   •  English   •   Aviation & Transport (Rail)
Only €3,49
THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail.

SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year.

In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary.

In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now.

Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past.

This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14.

Find out more in Railnews for August.
read more read less
Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages

Railnews

Aug-18 THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail. SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year. In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary. In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now. Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past. This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14. Find out more in Railnews for August.


FORMAT AUSWÄHLEN:
Sofortiger Zugang

Verfügbare digitale Angebote:

Einzelne digitale Back Issue Aug-18
 
3,49 / issue
Diese Ausgabe und andere ältere Ausgaben sind nicht in einem Railnews Abonnement. Das Abonnement enthält die letzte reguläre Ausgabe und die während des Abonnements erscheinenden neuen Ausgaben und ist bereits ab einem Betrag von €2,00 pro Ausgabe . Wenn Sie ein Abonnement abschließen möchten, sehen Sie sich bitte unsere Abonnement-Optionen
Die Ersparnisse werden auf der Grundlage eines vergleichbaren Kaufs von Einzelausgaben über einen annualisierten Abonnementzeitraum berechnet und können von den angegebenen Beträgen abweichen. Die Berechnungen dienen nur zu Illustrationszwecken. Digitale Abonnements beinhalten die letzte Ausgabe und alle regulären Ausgaben, die während Ihres Abonnements erscheinen, sofern nicht anders angegeben. Das von Ihnen gewählte Abonnement verlängert sich automatisch, wenn es nicht bis zu 24 Stunden vor Ablauf des laufenden Abonnements im Bereich Mein Konto gekündigt wird.

Issue Cover

Railnews  |  Aug-18  


THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail.

SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year.

In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary.

In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now.

Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past.

This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14.

Find out more in Railnews for August.
mehr lesen weniger lesen
Railnews is the number one publication for the rail industry, focusing on the people and business that keep today’s railway running. Originally produced in 1963 as the house newspaper for British Rail, Railnews continues to inform and impress in the modern industry. As well as in-depth editorial, the newspaper features views and opinions from readers and industry insiders alike.

Als Abonnent erhalten Sie die folgenden Vorteile:


•  Ein Rabatt auf den UVP Ihrer Zeitschrift
•  Ihr Magazin wird jeden Monat auf Ihr Gerät geliefert
•  Sie werden keine Ausgabe verpassen
•  Sie sind vor Preiserhöhungen geschützt, die später im Jahr eintreten können

Sie erhalten 12 Ausgaben während eines 1-Jahres Railnews Zeitschriftenabonnement.

Hinweis: Die digitalen Ausgaben enthalten nicht die in den gedruckten Exemplaren enthaltenen Umschlagseiten oder Beilagen.

Ihr Kauf hier bei Pocketmags.com kann auf jeder der folgenden Plattformen gelesen werden.


Sie können hier auf der Website lesen oder die App für Ihre Plattform herunterladen. Vergessen Sie nicht, sich mit Ihrem Pocketmags-Benutzernamen und Passwort anzumelden.

Apple Pocketmags Online Pocketmags Google Pocketmags
Die Pocketmags App läuft auf allen iPad und iPhone Geräten mit iOS 13.0 oder höher, Android 8.0 oder höher und Fire Tablet (Gen 3) oder höher. Unser Webreader funktioniert mit jedem HTML5-kompatiblen Browser, für PC und Mac empfehlen wir Chrome oder Firefox.

Für iOS empfehlen wir jedes Gerät, auf dem das neueste iOS für bessere Leistung und Stabilität läuft. Bei älteren Modellen mit niedrigeren Prozessor- und RAM-Spezifikationen kann es zu einer langsameren Seitenwiedergabe und gelegentlichen App-Abstürzen kommen, die außerhalb unserer Kontrolle liegen.
4,5
/5
Basierend auf 10 Kundenrezensionen
5
7
4
2
3
0
2
1
1
0
Rezensionen ansehen

Really interesting

Great for all those trainspotters out there Überprüft 25 April 2022

Always contemporary

The most up-to-date information on all with regard to the railway network Überprüft 09 April 2022

Railnews

I had a lot of trouble getting Railnews online so I've had to go back to getting it delivered. now we're in this pandemic, I'm having to go back to reading it online again. Überprüft 08 Mai 2020

Artikel in dieser Ausgabe


Im Folgenden finden Sie eine Auswahl von Artikeln aus Railnews Aug-18.