MOTORISTS using the A83 south of Port Ann are to benefit from better road drainage as improvement works worth £14,500 get under way later this month.
Work will begin on Monday February 27 for five days, with improvements carried out between 7am and 7pm each day with no weekend working planned. The programme will involve installing a drainage pipe and filter material to replace an existing drainage ditch over a 160m section of the road.
The road will remain open throughout the works, however, for the safety of road workers and motorists a 10mph convoy traffic management system will be in use. The convoy system will be removed outwith working hours. A 30mph reduced speed limit will be left in place as traffic will be running over a temporary surface.
Leggete l'articolo completo e molti altri in questo numero di
Argyllshire Advertiser
Opzioni di acquisto di seguito
Se il problema è vostro,
Accesso per leggere subito l'articolo completo.
Singolo numero digitale
24 February 2017
 
Questo numero e altri numeri arretrati non sono inclusi in un nuovo
abbonamento. Gli abbonamenti comprendono l'ultimo numero regolare e i nuovi numeri pubblicati durante l'abbonamento. Argyllshire Advertiser
Abbonamento digitale di 6 mesi
€28,99
fatturati due volte l'anno
Abbonamento digitale annuale
€51,99
fatturati annualmente