Contemporary Passivhaus
A green ethos lies at the heart of this eye-catching modern scheme, the design of which was developed by Gresford Architects. A highly insulated skeleton (manufactured offsite by MBC Timber Frame) was key to achieving the certified Passivhaus standards of energy performance. The structure was erected in just three weeks, with the swift construction speed minimising the amount of labour required on site.