■ TALYLLYN Railway (TR) has vacated the unit it has been using on the industrial estate near Tywyn Pendre. Contents moved back to the TR include the chassis of Fletcher Jennings 0-4-2ST No. 1 Talyllyn (now in the shed at Quarry siding – the boiler is being retubed by TR volunteers at the Mid-Hants Railway) and the wheeled chassis frame for the new four-wheel open coach which TR is constructing. The Vale of Rheidol Railway has been contracted to build a new TR ballast wagon.
■ CROWLE Peatland Railway took delivery of four 3ft gauge wagons from the Isle of Man on September 1. Three are former Lochaber Railway tipper wagons now on long term loan to the Lincolnshire line, which will undertake restoration work needed after a period stored at the Manx Electric Railway’s Dhoon Quarry sidings. The fourth is a single side chute ballast hopper which has been donated to the Crowle Peatland project.
Leggete l'articolo completo e molti altri in questo numero di
Railway Magazine
Opzioni di acquisto di seguito
Se il problema è vostro,
Accesso per leggere subito l'articolo completo.
Singolo numero digitale
1459 - October 2022
 
Questo numero e altri numeri arretrati non sono inclusi in un nuovo
abbonamento. Gli abbonamenti comprendono l'ultimo numero regolare e i nuovi numeri pubblicati durante l'abbonamento. Railway Magazine
Abbonamento digitale annuale
€40,99
fatturati annualmente
Abbonamento digitale di 6 mesi
€21,99
fatturati due volte l'anno
Abbonamento digitale mensile
€4,99
fatturati mensilmente