GB
  
You are currently viewing the United Kingdom version of the site.
Would you like to switch to your local site?
1 MIN READ TIME

Electrification rate ‘behind schedule’

RIA says railway electrification is running at less than half the rate needed to decarbonise by 2050

DATA published by the Office of Rail and Road shows that in 2020/21, 179 track-kilometres were electrified, which is less than half the 448 trackkilometres required each year to meet Network Rail’s target of a Net Zero railway by 2050, according to the Railway Industry Association (RIA).

Read the complete article and many more in this issue of Railway Magazine
Purchase options below
If you own the issue, Login to read the full article now.
Single Digital Issue 1448 - November 2021
 
£4.99 / issue
This issue and other back issues are not included in a new subscription. Subscriptions include the latest regular issue and new issues released during your subscription. Railway Magazine
Annual Digital Subscription £33.99 billed annually
Save
43%
£2.83 / issue
6 Month Digital Subscription £17.99 billed twice a year
Save
40%
£3.00 / issue
Monthly Digital Subscription £3.99 billed monthly
Save
20%
£3.99 / issue
PRINT SUBSCRIPTION? Available at magazine.co.uk, the best magazine subscription offers online.
 

This article is from...


View Issues
Railway Magazine
1448 - November 2021
VIEW IN STORE

Other Articles in this Issue


In This Issue
Sending mixed messages
TRAIN OF THOUGHT Editor ’s Comment Lumo’s No.
Win a free cab or footplate ride
WE are asking for your help this month
Features
Rail Adventure’s HST power cars Nos. 43484 and
Headline News
Freightliner switches to diesel haulage for electric diagrams
Temporary move is due to ‘unprecedented’ increase in electricity prices
£7bn transport boost for Regions
THE Chancellor Rishi Sunak was due to deliver
Lumo is go!
The new open access operator is now running its budget services between Edinburgh, Newcastle and London
The benefits of open access
Challenger entrants bring new ideas that keep established operators on their toes
DRS to sell off redundant locomotives and carriages
Operator’s eight Class 20s up for sale in first phase of older traction disposal
Controversial Battlefield ‘Peak’ set to be scrapped
AFTER almost 20 years in limbo, the end
SIDELINES
Digital signalling for heritage stock AS part of
November start for Dartmoor line services
Regular, all-year-round services to restart for first time since 1972. 
Extending the Borders Line is ‘best idea’ for the region
REOPENING the remaining section of Borders Railway to
SIDELINES
Waterloo to Bristol campaign SEVERAL campaign groups have
SIDELINES
Track monitoring trial DB ESG has announced a
Debut for innovative Very Light Rail vehicle
First of a kind Revolution VLR prototype offers lower cost option for railway reopenings
‘World first’ autonomous transit system for Shildon
LOCOMOTION, the National Railway Museum’s site at Shildon
HS2 News
SIDELINES
Your reports and pictures are most welcome. Highly
STRABAG will open factory in Hartlepool to fulfil order
The site of STRABAG’s Hartlepool factory, already rail-linked
First mile of tunnelling under Chilterns completed
Looking south towards London from inside one of
Green News
SIDELINES
Rail catalyst for jobs RESEARCH commissioned by the
Regulars
Railways in Parliament
Traction costs rise GATESHEAD MP Ian Mearns asked
Readers’ Platform
STAR LETTER Bridge bash woes READING the article
FROM THE RAILWAY MAGAZINE ARCHIVES
100 YEARS AGO NOVEMBER 1921 ‘Conductor-Guard’ Trains THE
The RCTS: then and now
Britain’s leading Railway Society
Panorama
There seems to be little interest amongst the
CHRISTMAS GIFT GUIDE
Nottingham to Mansfield By Vic Mitchell and Keith
Prize crossword
The crossword winner and two runners-up can choose books worth £50 and £25 respectively from the extensive Nostalgia Collection
Where is it?
Our pictorial quiz, for fun only
LOCO PROFILE
Farewell No. 9
Destined for a future on static display only, ‘A4’ No. 60009 has now worked its last train on both the main line and in preservation, a boiler tube leak scuppering plans for it to see out the last few months of its certification at the East Lancashire Railway
PRACTICE & PERFORMANCE
PUTTING IT BLUNTLY
John Heaton FCILT rounds off his coverage of the ill-fated GBRf ‘This time it’s personal’ tour, before looking at some extra detail of the West Coast Main Line record attempt earlier this year, and then comparing attacks on the climb to Whiteball summit in Somerset by different traction
Features
BREAKING BR’S STEAM BAN
October marked the 50th anniversary of ex-GWR ‘King’ No. 6000 leading the return to steam on the main line. Chris Milner recalls how the ban was broken, and how steam then developed under British Rail up to the point when the railways were Privatised
BERTHED IN PERTH
Hidden away at the north end of Perth station is the little-seen Up Carriage Sidings and shed, but earlier this year Jordan Kearney had permission to visit and take this photographic record
Tetbury remembered
Stephen Roberts looks back over the history of the former branch to Tetbury in Gloucestershire, where there is now a project to preserve memories of the line in the station’s former goods shed
Track Record
SIDELINES
Your reports and pictures are most welcome. Highly
Furness Railway No. 20 returns to action
Britain’s oldest working standard gauge steam loco back in traffic
‘Lizzie’s boiler needs £165K
LMS ‘Princess Royal’ Pacific No. 6201 Princess Elizabeth
Unique GWR carriage relaunched at Severn Valley
Robert Smallman, who saved No. 6045 nearly half
Supporters greeted by ‘face’ of ‘4MT’
SHAREHOLDERS and supporters of Toddington Standard Locomotive Ltd
Spring hopes for Rother Valley Railway Transport & Works Act Order decision
IT IS anticipated that a decision will be
SIDELINES
East Lancs upgrades THE project to improve the
Autumn galas delight
Varied line-ups generate welcome ‘feel good’ factor
Tyres back on the Duke
WELCOME BACK: LMS 4-6-2 No. 6233 Duchess of
West Somerset passenger trains all set for Minehead return in 2022
WEST Somerset Railway (WSR) passenger trains are on
Llangollen Railway secures future
THE Llangollen Railway Trust (LRT) says thanks to
New Gresley ‘P2’ ‘Mikado’ on course as cylinders and boiler take shape
THE project to build new Gresley ‘P2’ No.
DIARY
■ November weekends Didcot Railway Centre: Exhibition Days
Help ‘N2’ steam again
Gresley’s sole tank survivor needs your support to
Bluebell seeks to return sparkle to ‘jewel in the crown’
THE Bluebell Railway has launched an appeal for
‘County’ tender takes shape
STEAMING INTO BIRKHILL: Caledonian Railway (CR) 0-4-4T No.
SIDELINES
Derwent Valley Railway anniversary THE Derwent Valley Light
Iron ore opens to remain in Rutland
Former National Collection wagon pair gifted to accredited museum
Restored PalVan boosts Midsomer Norton fleet
THE Somerset & Dorset Railway Heritage Trust (SDRHT)
SIDELINES
Your reports and pictures are most welcome. Highly
Telford’s Rocket boosts Dean Forest’s gala
THE Dean Forest Railway may have been unable
Hunslet Hastings moves to the Chasewater Railway
Running-in gets underway on 133-year-old veteran in Staffordshire
Williton workshop to return Barclay Victory to action
ANDREW Barclay 0-4-0ST Victory (2201/1945) is to be
Steam Portfolio
COLLIERY SERVICE: Orenstein & Koppel 0-4-0WT (2378/1907) Utrillas
SINGLE LINES
Your reports and pictures are most welcome. Highly
Ogwen returns to steam – as Durham!
Former Durham County Water Board and Penrhyn Quarry locomotive hauls first trains for 56 years
‘Workshop X’ marks its fourth loco restoration
DURHAM (Ogwen) made a second appearance in DCWB
Delivery of Blyth replica to Suffolk home is imminent
SOUTHWOLD Railway Trust anticipated delivery of replica 3ft
£3.1 million lottery win for Ff&WHR
Ffestiniog Railway Double-Fairlie David Lloyd George runs across
Quadruple-header at Scarborough gala
SCARBOROUGH North Bay Railway celebrated the 90th birthday
Thornhill to be returned to steam?
PRIVATELY owned ex-Isle of Man Steam Railway (IoMSR)
Restored 3ft gauge Wickham Trolleys go to Crowle Peatland
THE Rail Trolley Trust (TRTT) has placed 3ft
Go-head given for overhaul of Sierra Leone No. 85
THE Welshpool & Llanfair Light Railway (W&LLR) has
Ferry Meadows Railway for sale
Opportunity to operate Peterborough 10¼in gauge Nene Park line
An efficient portable railway for hire
There and Back’s two current locos. Nomi (left),
SIDELINES
Your reports and pictures are most welcome. Highly
Work underway on new halt for Seaton Tramway
Devon line’s fifth tram stop will give visitors access to marshland nature reserves
Wirral volunteers help prepare site for reopening
IN anticipation of a date being announced for
Newcastle 114 fit for traffic at Beamish
A WASH AND BRUSH-UP: One of the youngest
SIDELINES
Your reports and pictures are most welcome. Highly
Nene Valley Railway stages three ‘Peaks’ challenge
PICTURE: ALISDAIR ANDERSON The gala featured a tripleheader
Ivatt 10000 diesel project makes further progress
THE Ivatt Diesel Re-creation Society (IDRS), like all
A safe future assured for Island Line Class 483 in non-rail use
FORMER Island Line Class 483 EMU No. 483004
Porterbrook Leasing gifts 8000th Crewebuilt loco to Crewe Heritage Centre
Class 43 HST power car No. 43081 in
Two 400 series cars to boost East Kent battery-powered EMU project
THE 400 Series Preservation Group (400SPG), based on
Highs and lows of visiting ‘Choppers’
THE North Yorkshire Moors hosted four main line-registered
Class 40 No. D345 makes a comeback
Making its first appearance following repainting in BR
CEPs relocate from Eastleigh Works to Southall
THE EPB Preservation Group has had to remove
Glos/ Warks celebrates 40th anniversary
THE Gloucestershire Warwickshire Steam Railway (GWSR) rounds off
Wickham trolley escapes from Dartmoor
WICKHAM 10841, a Type 18 fourwheel diesel permanent
Yorkshire Wolds Railway launches Fund the Fowler appeal
FOLLOWING arrival of its second loco, the recently
Dartmoor disposals, some saved, some scrapped
FIRST USE OF MID-NORFOLK RAILWAY’S Mk.3 STOCK: Stratford
Steam Dreams adds more main line Santa specials
Popular excursions hauled by Mayflower to run from London Victoria
Scotrail to operate charity HST Santa trains to Boat of Garten and Fife
SCOTRAIL is to operate its own ‘Santa Specials’
Northern Belle hopes for ‘Lizzie’ as it outlines 2022 steam plans
Making its West Coast Railway debut, Class 86
SIDELINES
Your reports and pictures are most welcome. Highly
£25m project to protect Wales and Borders link
Strategic Anglo-Welsh corridor to benefit from increased resilience
£8m investment to stabilise GSW embankments
Cutting sides are being regraded on the Glasgow
Tunbridge Wells-Hastings line closed for a week
CONCERN over the stability of earthworks between Tunbridge
Hitachi wins Gloucester area signalling upgrade contract
A DESIGN contract to replace the signalling in
First section of Dawlish sea wall completed
NETWORK Rail has finished upgrading the first section
Surbiton station to receive £6.7m capacity upgrade
NETWORK Rail has announced Surbiton station is set
Leeds prepares for minor remodelling
IN preparation for remodelling of the approaches to
Nine-day closure of Brighton Main Line
FOUR weekend closures plus a nine-day closure of
Second Ely capacity consultation begins ahead of TWAO submission
A PUBLIC consultation on proposals and options to
Disused track removed for Levenmouth line revival
THE Levenmouth rail link project has now completed
FM unveils Queen Street plaque
SCOTLAND’S First Minister Nicola Sturgeon unveiled two plaques
DfT development funding for Stratford improvements
Passenger numbers continue to grow at London’s busiest non-terminal station
Hayes & Harlington becomes step free
NETWORK Rail has completed an upgrade at Hayes
Network Rail and Amey develop innovative tunnel drill
BRUNEL BACK AT TEMPLE MEADS: A Statue of
Trackworkers turn rescuers in the Peak District
TWO Network Rail workers have been hailed as
SIDELINES
Your reports and pictures are most welcome. Highly
Freightliner receives its first FFA-G wagons
New fleet will allow more energy-efficient carriage of freight
DBC Class 66 on display
DB Cargo Class 66, No. 66004, which was
SIDELINES
Your reports and pictures are most welcome. Highly
Pride roundels revealed
Ten designs by well known LGBTQ+ Londoners and staff displayed at stations
Lower cost VLR track design developed
ENGINEERS working on the Coventry Very Light Rail
Dual fuel trial for GC '180'
Your reports and pictures are most welcome. Highly
Alzheimer’s helpline promoted
DISPLAYING the Alzheimer’s Society support line number, vinyl
New jacks for SWR depots
MECHAN has supplied new lifting jacks for South
Final ‘Paragon’ unit launched into traffic
Anniversary livery for fifth Hull Trains Hitachi Class 802 unit
Cumbrian rail heritage remembered with unit naming
BARROW-IN-FURNESS station was the venue for the naming
TPE Class 802s to enter WCML service next month
TRANSPENNINE Express has confirmed that, from December, Class
All five Lumo Class 803s authorised for public use
UNHAPPY JOURNEY: Scrapyard-bound convoys of Class 365s began
Bescot naming
FIRST THREE-CAR UNIT: On its first day of
'Pendolino' progress
WORK on Class 390, No. 390125, the first
Nine-year-old Freya names IET for GWR
PRIDE of Britain Award nominee Freya Bevan unveiled
COP26 launch for ‘next generation’ battery train
Daily services planned for Vivarail unit during climate change conference in Glasgow
WAGON REPORT
EUROPEAN Metals Recycling, Kingsbury has completed the scrapping
Stock Update
Your reports and pictures are most welcome. Highly
Operations
Your reports and pictures are most welcome. Highly
Operations
Sunny Scarborough sees the departure of Nos. 37401
‘Strengthened’ NIR 4000 Class enters service
Your reports and pictures are most welcome. Highly
Restored Guinness grain van relaunched
A FORMER Guinness Brewery grain van that was
Drumboe in triumphant Donegal homecoming
County Donegal locomotive returns to spiritual home after six decades away
Container service begins between Port of Waterford and Ballina
IARNRÓD Eireann-Irish Rail (IÉ) and XPO Logistics have
Stadler wins New Zealand loco order
Your reports and pictures are most welcome. Highly
Sandstone moves Cape gauge locos to safety
South African heritage collection relocated to main site
New ‘EMD’ passenger diesel locos built in Argentina
ARGENTINIAN national rail operator Trenes Argentinos has taken
Massive Soviet electrics fade away
Ukraine Railways (UZ) VL8M No. 1449 and VL8M
European heritage lines bounce back from Covid
On the 700mm gauge Hedelands Railway near Roskilde
Electric railways set for renaissance in Costa Rica to help cut carbon
THE Central American country of Costa Rica is
Chat
X
Pocketmags Support