Simplex Rachel was given a run out at the Lakeside & Haverthwaite railway on November 6, towing a brake van with the volunteers responsible for its overhaul. The 40hp machine dates from 1924, making this a 100th anniversary run, and it is pictured passing the 1913 Furness Railway signalbox at while leaving Lakeside station.
DAVE GARRETT