Colas Rail orange is the latest of many liveries to grace the classic outline of an InterCity 125 power car. Now used to power Network Rail test trains, 43277 Safety Task Force heads an infrastructure monitoring train away from Derby (with 43274 on the rear) on April 2.
STEVEN DONALD
The UK’s newest airport rail link opened to the public on March 27. Luton DART is a 1.4-mile cable-worked line connecting Luton Airport Parkway main line station with the airport terminal. The £290m link cuts journey times from central London to as little as 32 minutes.
LUTON RISING