THE new boiler made for Sybil Locomotive Trust’s Bagnall 0-4-0ST 1760/1906 Sybil was lifted into the frames for the first time on December 3.
The next tasks are establishing locations for fixings such as the saddle tank, boiler cladding and firehole door assembly.