Connel Bridge and the A828 south of Barcaldine have been closed overnight this week for resurfacing and repairs worth £385,000, aTher a vehicle struck the bridge’s overhead beams.
Drivers are facing a 42-mile diversion as 2.5km of the A828 between Barcaldine and Benderloch is closed at night until Friday November 16, when it reopens, and Connel Bridge is closed at night until Tuesday, November 13.
BEAR Scotland said due to Connel Bridge’s single lane, and restricted road widths at the area of resurfacing on the A828, both projects required road closures for safety.