Australian Railway History  |  ARH March 2018
Peter Cokley opens the March issue of Australian Railway History with Part 2 of his documentation of the Thomas Nationwide Transport (TNT) Salisbury Container Terminal. This outlines the changes that occurred there through to its closure in April 1996.
Frank Johnson concludes his account of his time as Divisional Engineer in the Narrabri Region of the NSW Railways by concluding the track restoration following the 1971 floods and documenting the railway accidents that occurred during his tenure. Frank also covers the mechanisation of track maintenance work at this time and the annual conferences of the Way and Works Branch in Sydney.
Rod Milne documents the extension of the Queensland Railways branch line from Allora to Goomburra opened in July 1912 and closed in December 1993.
Per saperne di più
leggere di meno
Come abbonati riceverete i seguenti vantaggi:
• Uno sconto sul prezzo di vendita della rivista
• La vostra rivista viene consegnata ogni mese sul vostro dispositivo
• Non perderete mai un numero
• Siete protetti dagli aumenti di prezzo che potrebbero verificarsi nel corso dell'anno
Riceverete 12 edizioni durante un periodo di 1 anno Australian Railway History abbonamento alla rivista.
Nota: le edizioni digitali non includono gli articoli di copertina o i supplementi che si trovano nelle copie stampate.
Articoli in questo numero
Di seguito una selezione di articoli in Australian Railway History ARH March 2018.