GOOD progress is being made on the restoration of Bagnall 0-6-0ST Lamport No. 3 (2670/1942) at the East Anglian Railway Museum (EARM), Chappel and Wakes Colne station, Essex. The chassis has been completely restored, apart from the vacuum braking system, which is being worked on.
Work is now well advanced on the boiler, with the recent delivery of a new inner firebox from the North Norfolk Railway and much certified plating having been replaced on the outer firebox. A new foundation ring has also been fabricated. All three major components are now coming together, with the manufacture of hundreds of stays, rivets, and approximately 150 fire tubes.
Leggete l'articolo completo e molti altri in questo numero di
Railway Magazine
Opzioni di acquisto di seguito
Se il problema è vostro,
Accesso per leggere subito l'articolo completo.
Singolo numero digitale
May 2023
 
Questo numero e altri numeri arretrati non sono inclusi in un nuovo
abbonamento. Gli abbonamenti comprendono l'ultimo numero regolare e i nuovi numeri pubblicati durante l'abbonamento. Railway Magazine
Abbonamento digitale annuale
€40,99
fatturati annualmente
Abbonamento digitale di 6 mesi
€21,99
fatturati due volte l'anno
Abbonamento digitale mensile
€4,99
fatturati mensilmente