Está atualmente a visualizar o Portugal versão do sítio.
Gostaria de mudar para o seu sítio local?
Última edição


Comprar para o Natal?
Clique em Comprar agora e depois em “Dar de presente

Railnews Magazine April 2024 Edição anterior

English
10 Comentários   •  English   •   Aviation & Transport (Rail)
Only €3,49
Labour’s shadow transport secretary Louise Haigh is accusing the Government of ‘complacency, negligence and creating chaos for Britain’s rail manufacturing industry’.

She visited the Alstom works in Litchurch Lane Derby on 2 April, where the factory is being mothballed because of a lack of orders for new trains. Alstom says it will have to start preparing for 1,300 redundancies, while Hitachi warned that up to 700 jobs are also at risk at its Newton Aycliffe works in County Durham.

A Northern train was derailed between Lancaster and Barrow-in-Furness on 22 March, and a void in the ground was discovered nearby. Unstable earthworks have been also causing problems between Wolverhampton and Shrewsbury as well as at Farnborough in Hampshire and New Mills in Derbyshire.

Network Rail chief executive Andrew Haines has warned that Control Period 7, which started on 1 April, will mean meeting challenges posed by ‘climate change, performance, industry revenue and reform’.

Although ASLEF strikes were going ahead, walkouts on London Underground and by tram maintenance staff in Croydon were called off after progress was made in peace talks.

Elsewhere, Siemens is investing £100 million to replace its rail infrastructure centre in Chippenham, a campaign has been launched to encourage young people to travel by train, and work to ease congestion at London Victoria is set to be completed by the summer.

Open access services are set to start running between London and Stirling next year after the ORR approved an application by Grand Union, although contracted train operators had objected. The Government has rejected a call from Transport for the North to end the Avanti contract.

In this month’s feature, we discuss the prospects for open access if Labour gains power and allows private sector contracts to expire, renationalising the passenger railway.

Railnews for April is out now.
read more read less
Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages

Railnews

April 2024 Labour’s shadow transport secretary Louise Haigh is accusing the Government of ‘complacency, negligence and creating chaos for Britain’s rail manufacturing industry’. She visited the Alstom works in Litchurch Lane Derby on 2 April, where the factory is being mothballed because of a lack of orders for new trains. Alstom says it will have to start preparing for 1,300 redundancies, while Hitachi warned that up to 700 jobs are also at risk at its Newton Aycliffe works in County Durham. A Northern train was derailed between Lancaster and Barrow-in-Furness on 22 March, and a void in the ground was discovered nearby. Unstable earthworks have been also causing problems between Wolverhampton and Shrewsbury as well as at Farnborough in Hampshire and New Mills in Derbyshire. Network Rail chief executive Andrew Haines has warned that Control Period 7, which started on 1 April, will mean meeting challenges posed by ‘climate change, performance, industry revenue and reform’. Although ASLEF strikes were going ahead, walkouts on London Underground and by tram maintenance staff in Croydon were called off after progress was made in peace talks. Elsewhere, Siemens is investing £100 million to replace its rail infrastructure centre in Chippenham, a campaign has been launched to encourage young people to travel by train, and work to ease congestion at London Victoria is set to be completed by the summer. Open access services are set to start running between London and Stirling next year after the ORR approved an application by Grand Union, although contracted train operators had objected. The Government has rejected a call from Transport for the North to end the Avanti contract. In this month’s feature, we discuss the prospects for open access if Labour gains power and allows private sector contracts to expire, renationalising the passenger railway. Railnews for April is out now.


SELECCIONAR FORMATO:
Acesso imediato

Ofertas digitais disponíveis:

Edição digital única April 2024
 
3,49 / issue
Esta edição e outras edições anteriores não estão incluídas numa Railnews inscrição. As assinaturas incluem a edição regular mais recente e os novos números lançados durante sua assinatura e começam a partir de €2,00 por edição . Se pretende subscrever, consulte o nosso Opções de assinatura
As poupanças são calculadas com base na compra comparável de edições únicas durante um período de subscrição anual e podem variar em relação aos montantes anunciados. Os cálculos destinam-se apenas a fins ilustrativos. As assinaturas digitais incluem a última edição e todas as edições regulares lançadas durante a sua assinatura, salvo indicação em contrário. O período escolhido será renovado automaticamente, exceto se for cancelado na área A minha conta até 24 horas antes do fim da assinatura atual.

Issue Cover

Railnews  |  April 2024  


Labour’s shadow transport secretary Louise Haigh is accusing the Government of ‘complacency, negligence and creating chaos for Britain’s rail manufacturing industry’.

She visited the Alstom works in Litchurch Lane Derby on 2 April, where the factory is being mothballed because of a lack of orders for new trains. Alstom says it will have to start preparing for 1,300 redundancies, while Hitachi warned that up to 700 jobs are also at risk at its Newton Aycliffe works in County Durham.

A Northern train was derailed between Lancaster and Barrow-in-Furness on 22 March, and a void in the ground was discovered nearby. Unstable earthworks have been also causing problems between Wolverhampton and Shrewsbury as well as at Farnborough in Hampshire and New Mills in Derbyshire.

Network Rail chief executive Andrew Haines has warned that Control Period 7, which started on 1 April, will mean meeting challenges posed by ‘climate change, performance, industry revenue and reform’.

Although ASLEF strikes were going ahead, walkouts on London Underground and by tram maintenance staff in Croydon were called off after progress was made in peace talks.

Elsewhere, Siemens is investing £100 million to replace its rail infrastructure centre in Chippenham, a campaign has been launched to encourage young people to travel by train, and work to ease congestion at London Victoria is set to be completed by the summer.

Open access services are set to start running between London and Stirling next year after the ORR approved an application by Grand Union, although contracted train operators had objected. The Government has rejected a call from Transport for the North to end the Avanti contract.

In this month’s feature, we discuss the prospects for open access if Labour gains power and allows private sector contracts to expire, renationalising the passenger railway.

Railnews for April is out now.
ler mais ler menos
Railnews is the number one publication for the rail industry, focusing on the people and business that keep today’s railway running. Originally produced in 1963 as the house newspaper for British Rail, Railnews continues to inform and impress in the modern industry. As well as in-depth editorial, the newspaper features views and opinions from readers and industry insiders alike.

Como subscritor, receberá as seguintes vantagens


•  Um desconto no PVP da sua revista
•  A sua revista entregue no seu dispositivo todos os meses
•  Nunca perderá uma edição
•  Está protegido contra aumentos de preços que possam ocorrer no final do ano

Receberá 12 edições durante um ano Railnews assinatura da revista.

Nota: As edições digitais não incluem os artigos de capa ou os suplementos que se encontram nos exemplares impressos.

Sua compra aqui no Pocketmags.com pode ser lida em qualquer uma das seguintes plataformas.


Pode ler aqui no sítio Web ou descarregar a aplicação para a sua plataforma, mas não se esqueça de iniciar sessão com o seu nome de utilizador e palavra-passe Pocketmags.

Apple Pocketmags Online Pocketmags Google Pocketmags
O aplicativo Pocketmags funciona em todos os dispositivos iPad e iPhone com iOS 13.0 ou superior, Android 8.0 ou superior e Fire Tablet (Gen 3) ou superior. Nosso leitor web funciona com qualquer navegador compatível com HTML5, para PC e Mac recomendamos Chrome ou Firefox.

Para iOS, recomendamos qualquer dispositivo que possa executar o iOS mais recente para melhor desempenho e estabilidade. Modelos anteriores com especificações mais baixas de processador e RAM podem apresentar renderização de página mais lenta e travamentos ocasionais de aplicativos que estão fora de nosso controle.
4,5
/5
Com base em 10 Comentários de clientes
5
7
4
2
3
0
2
1
1
0
Ver críticas

Really interesting

Great for all those trainspotters out there Revisto 25 abril 2022

Always contemporary

The most up-to-date information on all with regard to the railway network Revisto 09 abril 2022

Railnews

I had a lot of trouble getting Railnews online so I've had to go back to getting it delivered. now we're in this pandemic, I'm having to go back to reading it online again. Revisto 08 maio 2020

Artigos desta edição


Segue-se uma seleção de artigos em Railnews April 2024.

Conversa
X
Suporte Pocketmags