Está atualmente a visualizar o Portugal versão do sítio.
Gostaria de mudar para o seu sítio local?
Última edição

Railnews Magazine Aug-18 Edição anterior

English
10 Comentários   •  English   •   Aviation & Transport (Rail)
Only €3,49
THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail.

SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year.

In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary.

In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now.

Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past.

This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14.

Find out more in Railnews for August.
read more read less
Railnews Preview Pages Railnews Preview Pages Railnews Preview Pages

Railnews

Aug-18 THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail. SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year. In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary. In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now. Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past. This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14. Find out more in Railnews for August.


SELECCIONAR FORMATO:
Acesso imediato

Ofertas digitais disponíveis:

Edição digital única Aug-18
 
3,49 / issue
Esta edição e outras edições anteriores não estão incluídas numa Railnews inscrição. As assinaturas incluem a edição regular mais recente e os novos números lançados durante sua assinatura e começam a partir de €2,00 por edição . Se pretende subscrever, consulte o nosso Opções de assinatura
As poupanças são calculadas com base na compra comparável de edições únicas durante um período de subscrição anual e podem variar em relação aos montantes anunciados. Os cálculos destinam-se apenas a fins ilustrativos. As assinaturas digitais incluem a última edição e todas as edições regulares lançadas durante a sua assinatura, salvo indicação em contrário. O período escolhido será renovado automaticamente, exceto se for cancelado na área A minha conta até 24 horas antes do fim da assinatura atual.

Issue Cover

Railnews  |  Aug-18  


THE lead story in August’s Railnews reports the deepening crisis on Govia Thameslink Railway. The heated debate over the future of the franchise reached a new intensity as demands grew for action to be taken before Parliament’s summer recess, while transport secretary Chris Grayling also came under fire. Meanwhile, the Office of Rail and Road said it had found ‘systemic failings in Network Rail’s management of timetable changes, and in a separate report that South Western Railway disruption was caused in part by poor communication with Network Rail.

SWR is also being affected by more industrial unrest, with a new series of RMT strikes starting on 26 July. The possibility of further disruption was still making the news elsewhere. A blockade on the southern end of the Brighton Main Line for nine days in October to allow major engineering works has been postponed until the New Year.

In other franchise news, proposals to split the GW franchise into more than one contract were rejected by the transport secretary.

In the financial world, the proposed award of a Transport for London contract to Siemens to build 94 trains for the Piccadilly Line was challenged by two losing bidders, and the award is therefore on hold for now.

Each journey made on the Gunnislake branch line in Devon and Cornwall is worth £69 to the local economy, according to a new report. The line has been considered for closure more than once in the past.

This month’s feature looks at the future of stations, and how their importance as shop windows for the railway is being recognised once again, while Network Rail believes it has found Britain’s longest serving railwayman, at London Waterloo. Don Buckley started in 1953, when he was just 14.

Find out more in Railnews for August.
ler mais ler menos
Railnews is the number one publication for the rail industry, focusing on the people and business that keep today’s railway running. Originally produced in 1963 as the house newspaper for British Rail, Railnews continues to inform and impress in the modern industry. As well as in-depth editorial, the newspaper features views and opinions from readers and industry insiders alike.

Como subscritor, receberá as seguintes vantagens


•  Um desconto no PVP da sua revista
•  A sua revista entregue no seu dispositivo todos os meses
•  Nunca perderá uma edição
•  Está protegido contra aumentos de preços que possam ocorrer no final do ano

Receberá 12 edições durante um ano Railnews assinatura da revista.

Nota: As edições digitais não incluem os artigos de capa ou os suplementos que se encontram nos exemplares impressos.

Sua compra aqui no Pocketmags.com pode ser lida em qualquer uma das seguintes plataformas.


Pode ler aqui no sítio Web ou descarregar a aplicação para a sua plataforma, mas não se esqueça de iniciar sessão com o seu nome de utilizador e palavra-passe Pocketmags.

Apple Pocketmags Online Pocketmags Google Pocketmags
O aplicativo Pocketmags funciona em todos os dispositivos iPad e iPhone com iOS 13.0 ou superior, Android 8.0 ou superior e Fire Tablet (Gen 3) ou superior. Nosso leitor web funciona com qualquer navegador compatível com HTML5, para PC e Mac recomendamos Chrome ou Firefox.

Para iOS, recomendamos qualquer dispositivo que possa executar o iOS mais recente para melhor desempenho e estabilidade. Modelos anteriores com especificações mais baixas de processador e RAM podem apresentar renderização de página mais lenta e travamentos ocasionais de aplicativos que estão fora de nosso controle.
4,5
/5
Com base em 10 Comentários de clientes
5
7
4
2
3
0
2
1
1
0
Ver críticas

Really interesting

Great for all those trainspotters out there Revisto 25 abril 2022

Always contemporary

The most up-to-date information on all with regard to the railway network Revisto 09 abril 2022

Railnews

I had a lot of trouble getting Railnews online so I've had to go back to getting it delivered. now we're in this pandemic, I'm having to go back to reading it online again. Revisto 08 maio 2020

Artigos desta edição


Segue-se uma seleção de artigos em Railnews Aug-18.