DESIGN changes to a section of HS2 near Kenilworth, Warwickshire, will reduce environmental impact and avoid a major realignment of a local river.
The previous design envisaged the diversion of a 700m section of Canley Brook, but this has been reduced to just 80m, eliminating the need to excavate 600,000 cubic metres of material and insert 28,000 cubic metres of concrete.