Ballast was dropped on November 4 within the section of the headshunt leading to the buffer stop at Green Lane, Corwen where the embankment has been cut back above the road. The Shark van’s plough was deployed to spread the load. Pictured left to right are volunteers: Peter Jump, Peter Robson and Phil Morrey.
GEORGE JONES