SITE work commenced in late October at Ffestiniog Railway’s Boston Lodge works, preparatory to construction of the new Small Loco Shed. The building will provide some facilities for preparing and disposing locos for service, while also enabling small groups of visitors to see the railway’s loco fleet.
This structure is the first new building to be started as part of the £4.2 million Boston Lodge Redevelopment & Interpretation Project, towards which The National Lottery Heritage Fund is contributing £3.1 million (RM, November 2021). The new shed is located at the back of the site under the face of the old quarry to the seaward side of the main Boston Lodge works complex. In time, a new Garratt shed will be built between the current loco shed and this ‘small loco’ shed.
Leggete l'articolo completo e molti altri in questo numero di
Railway Magazine
Opzioni di acquisto di seguito
Se il problema è vostro,
Accesso per leggere subito l'articolo completo.
Singolo numero digitale
1461 - December 2022
 
Questo numero e altri numeri arretrati non sono inclusi in un nuovo
abbonamento. Gli abbonamenti comprendono l'ultimo numero regolare e i nuovi numeri pubblicati durante l'abbonamento. Railway Magazine
Abbonamento digitale annuale
€40,99
fatturati annualmente
Abbonamento digitale di 6 mesi
€21,99
fatturati due volte l'anno
Abbonamento digitale mensile
€4,99
fatturati mensilmente