SITE preparation was scheduled between Christmas and New Year for a bridge that will take HS2 over the M42 in North Warwickshire.
Originally intended to be of a traditional design, it was changed to a 10,000 tonne box structure to lessen road disruption. Once constructed, it will be put into place during a single movement during a week-long closure of the motorway in winter this year.