Ivatt overhaul THE overhaul of BR Ivatt ‘2MT’ 2-6-0 No. 46441 continues at the Lakeside & Haverthwaite Railway. The valve spindles have been assembled with their newly machined valve heads.
Volunteers have been busy cleaning up the disassembled motion and the cylinder cock operating mechanism.