Priorities have been identified to keep Argyll and Bute moving throughout the winter months.
In the event of any road accidents, there are 31 frontline vehicles ready for action and two spare in case of a breakdown.
The council also has a network of local contractors which can be used if necessary, which was the case earlier this year when the ‘Beast from the East’ and freezing temperatures struck the area.